Dressing Up the Window … for Privacy and Shade

Lake Greenwood Motorcoach Resort — Cross Hill, SOUTH CAROLINA

My favorite spot to sit and read … or blog … or watch the occasional TV show … is the passenger side sofa.  Situated next to a window, that perch allows me to feel like I am outdoors when I can’t sit on the patio while partaking of those activities.  The only problem is that if we have a neighbor on that side, there’s not much privacy unless I close the MCD shade.  Something I don’t really like to do as I feel closed in then.

To solve the problem, we decided to install an awning over the window to match the awnings that were factory-installed on the other windows.  Why one wasn’t installed on this window, I don’t know.  Perhaps Tiffin felt it was unnecessary since there is a huge patio awning on this side of the coach.  Yes, there is.  But it doesn’t afford all that much privacy.  And we don’t — or can’t — always open it.

The before … as Mui preps the slide surface for the awning installation.

So, Mui called the Tiffin Parts Department in Red Bay, and gave them the specifics of our coach and the measurements for the window.  Two minutes later, the technician not only had the part number for a Carefree Awning pulled up, he also had confirmed there was nothing Mui needed to be wary of and could drill as necessary to mount the awning on the side of the slide.  A week later, the awning was delivered to us here at Lake Greenwood, and Mui was ready to get to work.

The after … installation complete.

Those who aren’t interested in the details of the install can stop reading now.

The rest of you … keep scrolling for a photo essay of the install, which turned out to be quite easy.  The instructions that came with the awning kit actually made sense, and Mui had the factory-installed awnings to refer to when he wanted visual confirmation of the instructions.  The entire project took him less than two hours to complete.  And, as the Shake ‘n Bake ad goes … “And I helped.” ;-)

Yes, Mui does read instructions before he gets started on a project.

The awning kit includes: the awning in the roller tube (with protective covering);
the awning rail; the strap catch; the arm assembly; and the screws.

Step 1: measure and mark the position for the awning rail.

Step 2: Tape the awning rail in place and confirm distance from the window.

Step 3: verify that the awning rail is level.
Too bad the laser level is back in storage ;-)

Step 4: drill the pilot holes for the awning rail screws.

Step 5: remove the awning rail and spray silicone lubricant inside the track
to make it easier to slide the awning into the track later.

Step 6: put silicone on the back of the rail to create a seal against the side of the slide.

Step 7: reposition the rail, making sure the pilot holes align with the rail;
tape it in place; and secure it to the slide with the provided screws.

 

Step 8: inspect your handiwork after the awning rail is installed.

Step 9: time to work on the arm assembly; do not remove the spring locking pin at either end yet.

Step 10: slide the arm into the end cap (drill a pilot hole if necessary), and secure
the arm with a screw through the back of the cap.  Repeat for the other arm.

Step 11: carefully edge out the polyrod to make it easier to slide it into the rail;
do this for the length of the awning.

Step 12: gently slide the awning polyrod into the track on the rail.
Sorry about the blurry photo :-(

Step 13: not quite done yet, but the awning is in place and centered in the rail.

Step 14: after making sure the bumper pads on the back of the end caps are properly
positioned, and the arms are perpendicular to the awning, secure each
arm to the slide (drill a pilot hole first if necessary).

Step 15: remove the spring locking pins and unfurl the awning a couple of times using
the pull strap … this is necessary to align the awning on the roll tube, and
determine and mark the position for the strap catch.

Step 16: put silicone on the back of the strap catch to create a seal against the slide.

Step 17: position the catch as previously determined (see instructions that come
with the kit) and mount it to the slide with the provided screws.

Step 18: with the awning open and the pull strap secured by the catch,
mount the lower brackets of each arm to the side of the coach.

Step 19: secure the canopy in place, making sure the screws go through
the canopy, the polyrod, and the  awning rail.

Step 20: remove the protective film covering the roller tube.

Step 21: Installation complete; awning closed.

Open awning from inside … plenty of shade and privacy, and I still get to have a view to enjoy.

There were a couple of interim steps that I did not include since I was helping and I had to put the camera down.  Follow the instructions that came with the kit and you’ll be the proud owner of an awning in no time.

10 Days at Lake Greenwood … Already

Saturday, 20 July
Lake Greenwood Motorcoach Resort — Cross Hill, SOUTH CAROLINA
Temps: Lo 71F / Hi 88F (21.5C / 31C)

Should I say that time is flying … again?  I seem to say that a lot, don’t I?  But it seems like that’s the case no matter where we are or what we are doing.  Honestly, except for a couple of projects, some chores not worth mentioning, and two outings for shopping and visiting with friends, we’ve not been doing much more than chilling and reading since we plunked ourselves down at the Lake Greenwood Motorcoach Resort ten days ago.

81 easy miles (130 km) brings us from Gaffney to Lake Greenwood near Cross Hill.
(the inset map shows Our meanderings to-date.)

Faithful readers may recall that we stayed at this motorcoach resort for a few days in June when our plans to camp at the Army Rec Area at Lake Strom Thurmond fizzled out because of ants (post here).  We really enjoyed ourselves then and decided to return for a longer stay despite the possibility of some hot summer temps.  So, we’re back in lakeside site 32, which we’re leasing from the owner for a month.

Site 32 is one of the few directly on the lake.

Site 32 from the deck of site 33.

Left: A nice long concrete pad gives us plenty of privacy.
Right: Looking down towards the lake and Site 32 from one of the hilltop sites.

The monthly rate, based on $59/night, is discounted 25% and includes all utilities, amenities, and wi-fi.  Thanks to a flash flood that came through the property the day before we arrived, the wi-fi system is out at the moment. But Mel is working to get it up and running.  This stay is a budget-buster to be sure, but since we’ve been so good with our camping budget the first six months on the road, we can afford the ding on the wallet.

Left: View of Lake Greenwood looking back from the front of Site 32.
Right: Manicured grounds separate us from the house that neighbors the property.

The beautifully landscaped lush green grounds and the campground’s waterside location make it a wonderful place to relax.  If there is one problem, it’s the gnats.  To be expected when you’re near still water.  At least these bugs don’t swarm around us, nor do they bite.  But they do take every opportunity to come inside the coach.  (A bowl of apple vinegar with a dash of dishwashing liquid set on the dash by the door seems to catch most of them.)

the boat dock here at the resort.

the view from the boat ramp.

When we made plans to spend the summer in the south, we were resigned to being stuck inside the Phaeton with the air conditioning blasting.  Surprise, surprise!  We’ve actually had decent temps, with most days in the 85F-89F (29-32C) range.  Normally, that would be too hot for me.  But with reasonable humidity and plenty of shade, we’ve been able to sit on the deck or patio every morning, moving inside around 3:00p when the sun finally makes its way over the coach and across the lake to the distant shore.  That’s when it starts baking at our site and it’s time to go to the pool for a dip.  The locals say it’s an unusually cool summer.  Hey, we’ll take it.

Breakfast on the deck has become a morning ritual.

We’ll even take the rain that’s been a fairly constant element of the weather.  Of course we can say that because we didn’t have to deal with the flash flood that came through and filled the swimming pool with muddy water just before we arrived here.  The damage was limited, luckily.  We wouldn’t have known anything had happened had we not heard about it after the fact.

The clubhouse and the swimming pool are all cleaned up after the flash flood
created a mess before we got here.

Our first week was totally overcast, with frequent rain showers each day with no notice whatsoever.  One minute it would be dry; the next minute we’d hear the pitter patter of raindrops.  Most of the showers were little more than drizzles of short-duration, and we didn’t have to run inside — the awning and the shade curtain kept us dry.  We were dumped on several times, receiving about half-inch (13 mm) of rain on two of those occasions.  On all but a few days, thunderstorms were in the forecast, but they mostly came through late at night … if they came at all.  We can live with that.

Flowering plants add color to our site.

Then, on Tuesday (the 16th), a miracle happened.  The skies cleared and the golden orb called sun appeared.  Since then, we’ve had mostly blue skies dotted with lovely white clouds, and only one night of thunder showers.  The overcast moved back in this morning, but cleared up in the afternoon ... which seems to be par for this area. We’re keeping fingers crossed that the weather continues to be nice for at least one more day so that we can entertain our friends outdoors tomorrow.

one of the many eastern tiger swallowtails that visit the flowering plants at our site.

But enough of the weather.  I mentioned early on that we (Mui, really; but I helped) worked on two projects since our arrival 10 days ago.  One was an easy Phaeton mod, which I’ll write about in another post.  Yes … we drilled some more holes into the coach ;-)  The other project was a lot of work, but not blog worthy, so I will spare you.

There’s a flock of Canada geese that swims by several times a day.

I also mentioned that we did two outings.  One involved a drive to Greenwood, about 15 miles (24 km) away.  It was a grocery run that Mui did on his own; I’ll go with him next time to check out the town.

piedmont clubThe other outing was a 51-mile (82 km) drive to Spartanburg last Saturday to have dinner with a schoolmate of Mui’s.  Nur, and her husband, Faruk, are originally from Turkey, but have been in the US for quite a few years.  They both teach at the University of South Carolina (USC), and Faruk also has his own business.

First, they entertained us at their home, where we had cocktails and tasty appetizers.  Then, they took us on a quick driving tour of the USC Spartanburg campus and downtown.  Finally, they hosted us at the Piedmont Club where we enjoyed a delicious meal and southern hospitality in a “relaxed style.”  Alas, our camera was left behind in the toad, so no photos from that evening.  I’ll try to make up for that when they join us for dinner at the Phaeton tomorrow.

Oh yes, I almost forgot.  There was an event today to celebrate our 10-day anniversary at Lake Greenwood.  OK, OK … even though the ice cream social at the clubhouse really wasn’t in our honor, it was fun.  Organized by Peggy (she and her husband own one of the lots here), it gave us an opportunity to meet and chat with some of the owners and ‘renters’ sharing the property with us.  Peggy has now invited us twice to go out on their pontoon boat, but we’ve had to decline both times.  Third time’s the charm they say ;-)

The hot tub (right) was too hot on a hot day (get it … it was  hot today),
but we did take a dip in the pool (left) after the ice cream social.

From our north-south facing site we don’t get to enjoy sunrises …

This is the best I can do for a sunrise photo … on a misty morning, no less.

… but we do get to enjoy some pretty spectacular sunsets from the deck … and patio … and even from the passenger-side sofa if it’s too hot to be outside. You might think that with the unchanging view, the sunsets would all be the same … but they aren't ...

As I call it a wrap for this post, the forecasted rain has started beating a gentle tattoo on the roof.  No problem, I’m inside … and I love to go to sleep to the sound of raindrops, so I don’t mind one bit.  I do hope it clears up for tomorrow, though.  Two minutes later, and the rain has stopped.  Still keeping fingers crossed for tomorrow!

Camp Freightliner … We Survived

Wednesday, 10 July
En route to Cross Hill, South Carolina

Our two days in class passed in the blink of an eye.  At the moment, we are on our way to Cross Hill, South Carolina for a month-long stay at Lake Greenwood.  But that’s for another blog post.  Now that we’re on I-85 South, I have about 75 miles (120 km) in which to write about our chassis class.

Camp Freightliner is designed for RVers who have motorhomes built on FCCC chassis — in our case, an X-CR (pictured to the right).  By the way, FCCC stands for Freightliner Custom Chassis Corporation, which is owned by Daimler in Germany.

Attending Camp Freightliner was high on our list once we began fulltiming.  In fact, we initially scheduled it for March of this year.  When Mui’s sister announced that she would be in New Orleans in March, however, we shifted our plans around and re-scheduled for July instead.

The two-day class is held in Gaffney, SC … home of the only Freightliner-owned service center.  Our initial plan included having the Phaeton serviced and weighed here as well.  When we postponed the class to July, we canceled our service appointment to stay on track with our regular maintenance schedule.  We did keep the four-corner weighing appointment, which was taken care of in one of the six service bays while we were in class on Monday.

I’ll digress for a moment and admit that we had a bit of a scare when we got the weight results back and saw that we were slightly over our rear-axle limit.  Then we remembered that we had a full-tank of fresh water on board for our stay in Freightliner’s electric-only campground.  A full tank for us is 90 gallons, which equates to 750 pounds (340 kg) … not something we usually carry around.  Add to that some stuff that we had moved from the car into the rear of the coach, and that explained the overage.  We’re back to our normal weight now — phew!

On with the class …

The table and the floor around it has Mike Cody’s show-and-tell props.

The class ran from 8:00a to 4:30p on day one, and until 6:30p on day two — we had a lot of questions and wanted to make sure we reviewed the new annual maintenance lists before calling it quits.  The good news — no more M1-M2-M3 service for us; we’re on the new schedule.

Each day had a morning and an afternoon break, as well as a 30-minute lunch break — catered, in our case, from Firehouse Subs one day, and Zaxby’s Chicken the next day … both with very yummy chocolate chip cookies for dessert.  Dinner at the end of the first day was included in the cost of the class — BBQ chicken and pork with sides.  The cost: $175 for one; $225 for two if the co-pilot attends.

If you’re having service done, or if space is available, you can stay free at the service center campground on site for the duration of the class.  Otherwise, the KOA nearby gives a 10% discount to Camp Freightliner participants; shuttle service provided by Freightliner.  Since space was available, we stayed on-site for the three nights that we were there.

We joined eight rig-owners in the classroom.  All but three of the drivers were attending with their co-pilots, so we had a full class of 15 participants.  We had a mix of coaches — one other Tiffin, a couple of Winnebagos, Fleetwoods, and Thors, and a Newmar.  Model years ranged from 2006 to 2013; some with DEF, others without.

Each rig-owner received a generic binder, which we customized as we went through the material during class.  The binder included a section with pictures of just about everything to do with the chassis and whatever Freightliner installs on it before delivery to the builder — such as the engine, the dash, the wheels and tires, the shocks, the air system (which operates the brakes and suspension, etc.), and the fuel and DEF tanks.

Camp Freightliner instruction materials …
the keychain and “I Survived” pin were our graduation gifts.

We each also received a sheet with information specific to our vehicles (based on the VIN), such as: the actual build date for the chassis — important for the maintenance schedule; engine make/model; transmission make/model … and on and on.  We referred to this information throughout the class to customize our binders.

At the conclusion of the class, each rig-owner was given a CD with e-versions of the binder content.  Once we confirm that we do indeed have everything on the CD, we’ll recycle the binder.  After all, we don’t need the added weight of a couple hundred sheets of paper in the rig ;-)

The class is taught by Mike Cody.  If you have a Freightliner chassis, you’ve probably heard his name sung in high praise.  It’s well-deserved.  He is a walking encyclopedia for all things related to the chassis.  If I recall correctly, he’s been with Freightliner for 17 years.  Though Mike spent a chunk of years in California, his drawl (not to mention his humor) gives him away as a southerner.  All this came out quickly during the first part of day one, when we made the round of introductions.  His instruction style made the class fun — no dry and boring lecture here.

Mike and Mui talk about the coalescing filter maintenance requirements.

Following introductions on the first day, Mike went through a list of parts, and what he suggests every rig-owner should carry — whether you intend to use them yourself or have them handy in the event a technician doing work on your rig doesn’t have the right part (or the cost is exorbitant).  This is done early in the class so that any parts you wish to order can be brought over before the end of class on the second day.  Mui already had most of the things on Mike’s suggested carry-list, but we did order a few additional items.

Then Mike got into the meat of the material, and continued with it through day two.  As he discussed various aspects of the chassis, he pointed out who in class had similar components so that we could “chat” on our own later, and share tips and tidbits.  The discussion was punctuated with frequent questions from the students, and he patiently answered — and re-answered if warranted.  He took us through “Access Freightliner,” the website where owners can look up information on their rigs based on VIN number and find detailed schematics and parts information.  Mike also ran through an LBCU simulator to show us how to program it to meet our own needs — three years of owning the rig and we had no idea that the LBCU (light bar control unit [located in the dash]) was programmable!

Throughout the two days, Mike dropped useful hints to make us all better drivers.  From how to use the mode button effectively; to keeping the engine in optimum RPM range by downshifting for best fuel economy; to long idling in some states becoming a ticketable offense, and how to get around that if you do idle for more than 10 minutes … just to mention a few.

In researching Camp Freightliner, I’d read that some co-pilots opted not to attend, or left after sitting through a small portion of the class.  I’d also read that some co-pilots found the information overwhelming, or boring, or difficult to comprehend.  That had me a bit concerned at first.  Having been through the class now, I am glad I opted to attend the full session.  I can’t say that I “got” everything Mike explained.  I didn’t, and I wasn’t there to get it all; that would have been too overwhelming.  My goal was to have enough of a familiarity with the material to be able to carry on an intelligent conversation with my driver.  During class, I found that tuning out when Mike was talking about information not-specific to us, gave my brain a rest and I was more alert when he discussed specifics with us.

That Mui, as the primary driver, “got it” is what matters in the grand scheme of things.  He did comment when we were discussing the class last night that he’s glad he didn’t attempt to take the class before he had some hands-on familiarity with the coach.  By waiting to take it after owning the Phaeton for three years, he felt he “got” more out of Mike’s instruction.

Another graduation gift ;-)

To wrap up our Camp Freightliner experience …

It’s not that the information Mike shared with us is not available elsewhere.  It is … in owner’s manuals, websites, etc., etc.  But the class environment brought it all into one place, making it easier to find and use.  All of that was well worth the cost of the class!  As for the un-written tidbits that Mike shared with us … priceless.  Attending Mike’s class is well-worth the price of admission in our opinion, and we would recommend it to anyone who owns a rig built on an FCCC chassis.

You would think that after two days of all things Freightliner, we would be ready to high tail it out of dodge.  Not so.  After a good night’s rest, we got up this morning, prepared the coach for departure, and then locked it up and went off to do one last thing on our agenda — a free tour of the Freightliner plant a few miles down the road from the service center.  Not surprisingly, many of our classmates had the same idea.

Wearing our “new” uniforms, we felt at home at the Freightliner Plant.
Thanks for the t-shirts, Mike.

The plant in Gaffney has three production lines to build chassis for walk-in vans (think UPS, FedEx), school busses, and motorhomes.  Currently they are averaging 100 chassis per day, with capacity to increase should the number of units ordered warrant the hiring of additional techs.

After collecting our visitor badges and viewing the safety video, someone from the marketing staff took our group of 12 around the small plant, stopping periodically to explain over the din of production what we were seeing and answering our questions.  It was interesting to note that all the chassis rails are manufactured in Mexico.

The initial work on the chassis is done while it is upside down on the production line.  Once the under-chassis work is completed, it is lifted, rolled over in the air, and placed right-side up to complete the installation of such things as the engine, DEF tank, etc.  We were in time to watch the roll-over process and see several units come off the line in preparation for the next step — putting the chassis through rigorous testing in the dyno room (which is not part of the tour).

From the galvanized rails, I might guess that this is a UPS walk-in van being turned right-side up.
(No photography allowed inside the plant.)

The tour was interesting, and we’re glad we went.  Buuuuuuuut … having been through the Tiffin plant and paint shop tours, where you can wander on your own, take pictures, and talk to the techs to have questions answered, this tour fell a bit short of our expectations.  That said, the Tiffin tours are an anomaly, so we’re glad we spent the 1½ hours to check out the Freightliner plant to wrap up our Camp Freightliner experience.

Greetings from Gaffney

Sunday, 7 July
Camp Freightliner — GAFFNEY, SOUTH CAROLINA
Temps: Lo 69F / Hi 83F (20.5C / 28C)

We left Virginia Beach yesterday morning and are in Gaffney, South Carolina now.  But before I get to the reason why we came here, a few words to wrap up our last week in Virginia Beach.

the Navy (left) and Marine Corps trainees marched by Sea Mist, our campground at the
Dam Neck Annex, NAS Oceana.  Early birds that we are, their cadence calls did not
disturb us when they came by around 7:15a daily.

Not much to write about since our plans for our final week at Sea Mist were mostly rained out.  The rain wasn’t constant, but we got light drizzles and downpours with no warning throughout the day … almost every day — until we hit the 4th of July.  Independence Day turned out to be a gorgeous day with lots of blue sky and puffy clouds — but it was too hot to be in the sun.  So, we made the most of our shade curtain and the light breeze that was a constant at our site to sit outside and enjoy the patio.

No birds to entertain us at Sea Mist … but plenty of dragonflies.

Our 23-day stay at Sea Mist was our longest in one place since getting on the road in December.  We weren’t very active physically, but I think we expected that.  After all, neither one of us much cares for heat and humidity.  So why not turn the wheels north or go up into the mountains where it might be cooler?  That was the plan, but we had to jiggle and wiggle, and move things around earlier this year, so a hot summer it shall be for us this year.

Looking back on our stay in Virginia Beach, it could have been much worse.  I didn’t think I’d be able to spend any time outdoors.  As it is, thanks to the breeze we got every day, I managed to sit outside for hours on end most days.  And the bonus was that I made considerable headway with the details for our fall vacation.  I even managed to process photos and put up several Two to Travel posts to catch up on last fall’s trip to Turkey.  A few more entries, and I’ll be done with that trip and can start thinking about how I am going to stay on top of blogging during this year’s much longer vacation.  I probably need to just accept the fact that’s not going to happen.

So, I’ll move on from Virginia with a fitting …

“The End” offered by one of the many blue darters that visited us daily.

… and move on to South Carolina.

We began our 404-mile (646 km) trek from Virginia Beach to Gaffney shortly after 8:00a yesterday morning.  The shortest route was on I-85 South, which meant that we were once again limited with campgrounds for our mid-point break.  In the end, we decided to overnight at the Greensboro Campground — the same place we stayed at on our way north to Ashland, Virginia in early June.  It’s not a destination campground, and we again had difficulty getting level, but it was fine for an overnight stay.  (My review from our earlier stay is here.)

404 miles (646 km) in two segments takes us from Virginia to South Carolina,
with an overnight stay in North Carolina.

Since today’s segment was only 148 miles (237 km), we weren’t planning on leaving Greensboro early.  But … we were both up at 5:30a.  We tried some tactics to delay our departure, taking time to not only have a healthy breakfast, but also going for a walk around the campground.  Our efforts were for naught, however, and by 8:30a, we were heading south on I-85.

A fruit bowl for breakfast is part of our new healthy-eating plan.

So, what’s there in Gaffney that we put it on this year’s Phaeton journeys?  Not much.  Even the city website lists only three things to do — visit the farmer’s market … our schedule doesn’t mesh with when the market is open; check out the visitor center/art gallery … it wasn’t open today, and the hours are wrong for the rest of our time here; and finally, explore the Cowpens National Battlefield … sorry, too hot and humid to go wandering around outside — even if we could fit it into our schedule.

This doesn’t look like a destination campground, does it?

So why did we come here if we’re not going to do any of the suggested activities?  We’re here to attend a two-day class for RVers who own rigs built on Freightliner chassis.  We were going to do this in March, on our way back up north from the Tiffin Service Center in Red Bay, Alabama.  But when Mui’s sister sent us a message that she was going to be in New Orleans in March, we switched things around so we could spend time with her instead.  Hence the odd-looking first-year travel map (inset in the map above).

Nine of the twenty sites at Camp Freightliner are now occupied, including two of
the three pull-throughs next to us that were empty when I took the photo.

We arrived at Camp Freightliner around 11:30a to find only 4 of the 20 electric-only gravel sites occupied.  We could have just taken one of the three pull-through sites  (the empty ones to our left in the photo), but decided on a back in site that looked more level to us.  With only a power cord to hook-up, we were settled in no time.

Next on the agenda was a quick stop at Wal-Mart, so we drove the 1.5 miles into downtown Gaffney.  While at it, we managed to sneak in a bit of sightseeing when we spotted a quaint log cabin near City Hall.  Turns out the cabin was built in 1804 by an Irishman named Michael Gaffney.  If I interpreted the signage accurately, he is the founding father of the city.

Arriving in the area in 1803, Gaffney purchased 805 acres of land for $600
and built this log cabin in 1804.

From the nearby signage:

Michael Gaffney was born in Granard, Ireland and immigrated to the United States in 1797.  After a short period in New York, he set sail for Charleston, South Carolina.  He departed Charleston for upstate and arrived at Smith's Ford on the Broad River on December 17, 1800.  There he met and married Mary "Polly" Smith, daughter of John Smith, on July 21, 1803.  Gaffney purchased 805 acres of land from Jon McKie on January 20, 1804 for $600.  He then constructed this home, store and trading post at the corner of present day N Granard Street and Baker Boulevard.  This intersection was a Native American trail and wagon road.  It became known as Gaffney's Crossroads; later Gaffney's Old Field. Michael and Polly's first child was born June 1 1804, most likely in this log home.

The hand-hewn boards are all original to the cabin, which was moved here
from where it was initially built a few blocks away.

The cabin was locked up, and the windows were shuttered, so we had to make do with just seeing it from the outside.  Thus completing our sightseeing, we returned to the campground to rest up for two-days of classwork.

As I write this post, Mui’s busy making money?  How?  He’s working his way through an online driving course that will net us a $25 gift card when he completes it.  The offer came to us from USAA, with whom both our vehicles are insured (the RV is with Progressive, but under the USAA umbrella).  The Drivesharp program, which is worth $89, is being offered for free to USAA members age 55 and older (you must have an active USAA auto insurance policy in the US).  Look into it if you qualify (click the word Drivesharp above to get to the website).

Looks like Mui is playing an online game, doesn’t it?
Actually, he’s taking an online driving course.  He has successfully made
his way from Acadia NP to Shenandoah NP, and is now navigating the Smokies.

When we initially signed up for the March session of Camp Freightliner — the class, not the campground — we intended to have the M3 service done here as well.  Those plans changed when we postponed the class to July.  We had the service done at Bay Diesel while we were in Red Bay, so we cancelled the appointment here.  However, we are going to go ahead and get the four-corner weighing done.  Freightliner will take care of that while we’re in class tomorrow.

The RV parking at the service center is free for those who are having their rigs serviced; trainees like us can stay here as long as space is available.  We’re up to nine rigs now, one a fellow-Phaeton.  We are hoping that there will be plenty of space for us to stay here through the end of our two-day class.  If not, there is a KOA nearby that offers a 10% discount for those who are in Gaffney for the Freightliner class.

Neither of us has been in a classroom setting in quite some time, so the next two days ought to be interesting.  Stay tuned to find out if we passed with flying colors ;-)